Quotation & Payment Terms
A:
For a new project: schematic, mechanical drawing, component library, and the planned number of layers (stackup information)
For a revision project: the previous main design file, the new schematic, the new mechanical drawing (or a design file that already has the netlist imported), and a description of the requested changes
A: We use two pricing methods:
1. New project pricing = Total pin count × per-layer unit rate
This is based primarily on the "total pin count" (total number of component pins), evaluated together with the number of board layers.
- If HDI design is required, the unit rate increases.
- Adding new components to the library is billed separately by working hours.
- Rework is billed separately by working hours.
(Rework refers to cases where previously completed work requires modification — due to routing changes, mechanical adjustments, impedance changes, stackup adjustments, etc. — that exceeds one day's worth of work. In such cases, we will separately log and report the rework hours.)
2. Revision project pricing = Estimated working hours × hourly rate
This is based on a comprehensive evaluation of the latest schematic and mechanical drawing applied to the board, the ratio of loose/unrouted nets, and the number of newly added components.
- Minimum billing unit is 0.5 hours.
A: We evaluate this case by case. For example, if sections such as the CPU & DDR can be reused as-is without needing to be re-routed, a discount will be applied.
A: Yes, this is open to further discussion.
A: Yes. New projects are calculated based on the final total pin count; revision projects are calculated based on actual working hours.
If rework hours, overtime hours, or component library creation/modification hours were requested during the process, these will all be consolidated into the final quote.