Q&A

A: The process is as follows:

  1. Confirm layout requirements
  2. Provide a preliminary quote
  3. Pre-processing / preparation work
  4. Client confirms to proceed
  5. Placement
  6. Routing
  7. Client confirms Gerber output
  8. Provide final quote

A: We set up a dedicated communication group (Teams/WeChat).

Progress is discussed through the group, and we upload the day's work status before the end of each business day.

Once placement is complete, we confirm it with the client before proceeding to routing. The final Gerber output timing is determined by the client.

A:

For a new project: schematic, mechanical drawing, component library, and the planned number of layers (stackup information)

For a revision project: the previous main design file, the new schematic, the new mechanical drawing (or a design file that already has the netlist imported), and a description of the requested changes

A: We use two pricing methods:

1. New project pricing = Total pin count × per-layer unit rate

This is based primarily on the "total pin count" (total number of component pins), evaluated together with the number of board layers.

  • If HDI design is required, the unit rate increases.
  • Adding new components to the library is billed separately by working hours.
  • Rework is billed separately by working hours.

(Rework refers to cases where previously completed work requires modification — due to routing changes, mechanical adjustments, impedance changes, stackup adjustments, etc. — that exceeds one day's worth of work. In such cases, we will separately log and report the rework hours.)

2. Revision project pricing = Estimated working hours × hourly rate

This is based on a comprehensive evaluation of the latest schematic and mechanical drawing applied to the board, the ratio of loose/unrouted nets, and the number of newly added components.

  • Minimum billing unit is 0.5 hours.

A: We evaluate this case by case. For example, if sections such as the CPU & DDR can be reused as-is without needing to be re-routed, a discount will be applied.

A: Yes, this is open to further discussion.

A: Yes. New projects are calculated based on the final total pin count; revision projects are calculated based on actual working hours.

If rework hours, overtime hours, or component library creation/modification hours were requested during the process, these will all be consolidated into the final quote.

A: Please provide the schematic, mechanical drawing, component library, stackup table, layout guide (routing notes/considerations), and any relevant reference materials or reference boards.

If new components need to be created, please also provide the component datasheets.

A: Once the project is complete, we run an internal review process to ensure the routing has been optimized and there are no short circuits. We then send the official main design file and output package via email, including: film files (Gerber), mechanical drawing, component coordinate diagram, component coordinate file, 3D files (EMN, EMP, or STEP), and a length-matching table.

A: Yes.

A: Please let us know your target deadline as early as possible. If our internal assessment determines that evening or Sunday overtime work is needed to meet the deadline, overtime fees will be calculated separately in the quote.

  • Weekday evening overtime is billed at 1.5× the standard hourly rate.
  • Sunday overtime is billed at 2× the standard hourly rate.

A: This service is not currently offered.

A: We sign a formal Non-Disclosure Agreement (NDA) with all clients, and our internal data access is protected by strict access controls and server security measures.